The second phase of the modernisation project for the coastal path from Arguineguín to Anfi beach now has €1.8m of funding in place and is due to start in the summer of 2018.
The improvements to the La Lajilla natural pool and beach that make up phase one of the project are now almost complete.
The funds come from the Canary Islands Tourist Infrastructure Department (Infraestructuras Turísticas del Gobierno de Canarias).
Phase two covers the 272 metres between La Lajilla and small sand and pebble Playa de La Carrera beach. It includes repaving the path, new benches and seating, and strengthening the seawall to prevent future damage.
The project also includes improvements to La Carrera beach such as more sand, bathroom facilities, disabled access ramps, and a lookout point.
Source: Maspalomas Ahora
Further reading
Browse other recent articles
-
-
-
-
31 Jul 2024
Tips to protect yourself against rental scams
We recommend
Take a look at this property selection
-
View all photos
- Bedrooms 3
- Bathrooms 3
- Built area 168m2
- Terrace 30m2
-
View all photos
- Bedrooms 3
- Bathrooms 3
- Built area 117m2
- Terrace 84.4m2
-
View all photosRef 05768-CA
House for sale in Monte León, Gran Canaria
- Bedrooms 2
- Bathrooms 2
- Built area 111m2
- Terrace 51m2
-
View all photosRef 05750-CA
Apartment , seafront for sale in Bella Bahia, Playa del Inglés, Gran Canaria with sea view
- Bedrooms 2
- Bathrooms 2
- Built area 112m2
- Terrace 20m2
-
View all photos
- Bedrooms 3
- Bathrooms 2
- Built area 170m2
- Terrace 27m2
-
View all photosRef 05757-CA
Apartment for sale in Residencial Ventura, Arguineguín, Loma Dos, Gran Canaria with garage
- Bedrooms 2
- Bathrooms 1
- Built area 61m2
- Terrace 29.76m2