Yesterday the 2 parts of the tunel named Lechugal-Candelaria in the construction of the new Highway to Playa de Mogán "found each other".
Further reading
Browse other recent articles
We recommend
Take a look at this property selection
-
View all photos
- Bedrooms 6
- Bathrooms 4
- Built area 279m2
- Terrace 109m2
-
View all photos
- Bedrooms 2
- Bathrooms 2
- Built area 120m2
- Terrace 169m2
-
View all photos
- Bedrooms 5
- Bathrooms 3
- Built area 225m2
- Terrace 194.88m2
-
View all photos
- Bedrooms 4
- Bathrooms 4
- Built area 342m2
- Terrace 192.88m2
-
View all photos
- Bedrooms 3
- Bathrooms 3
- Built area 168m2
- Terrace 30m2
-
View all photos
- Bedrooms 3
- Bathrooms 1
- Built area 81m2
- Terrace 77.8m2